    Hospital Oxygen System Installation in Arlington, VA

    Medical Testing SolutionsNovember 6, 202618 min read
    Share
    Hospital Oxygen System Installation in Arlington, VA

    Hospital Oxygen System Installation Arlington VA: Engineering Guide

    Planning a hospital oxygen system installation in Arlington, VA requires aligning municipal building regulations, Virginia Department of Health guidelines, and the strict life-safety criteria established in NFPA 99 (Health Care Facilities Code). Whether constructing a new acute-care tower, upgrading an existing bulk cryogenic liquid supply, or fitting out an ambulatory surgery suite, your oxygen distribution infrastructure forms the life-support backbone of clinical operations.

    Navigating the transition from primary storage tanks to patient delivery requires meticulous mechanical execution, certified brazing protocols, and independent verifications. This guide details everything clinical directors, healthcare facility engineers, and general contractors must know regarding hospital oxygen system installations across Northern Virginia. We explore engineering parameters for bulk cryogenic tanks, high-pressure manifolds, zone valve boxes, medical gas alarm panels, and the critical regulatory separation between certified medical gas installation under ASSE 6010 and independent third-party medical gas verification under ASSE 6030.


    The Regulatory Framework: NFPA 99, CGA, and Virginia Codes

    In the Commonwealth of Virginia, healthcare engineering mandates conform to the Virginia Uniform Statewide Building Code (USBC), which directly incorporates the International Plumbing Code (IPC) and NFPA 99: Health Care Facilities Code. For clinical oxygen systems, compliance also relies on standards published by the Compressed Gas Association (CGA) and the American Society of Sanitary Engineering (ASSE). | Diagram text | |, | | NFPA 99 Category 1 Oxygen Architecture | | PRIMARY SOURCE: Bulk Liquid Oxygen RESERVE SOURCE: Manifold / Micro-Bulk | | - Per NFPA 55 & CGA M-1 Distances - Automatic Changeover Manifold | | - Dual Cryogenic Ambient Vaporizers - Sized for Minimum 24-hr Peak Demand | | Emergency Oxygen Supply Connection | | (EOSC) - Exterior Building Wall | | Main Line Valve & Source Equipment | | Master Alarm Integration | | Zone Valve Boxes (ZVB) & Area Alarms | | Per Clinical Department/Floor Wing | | Medical Gas Outlets / Terminal Units | | DISS / Quick-Connect (ASSE 6010/6030) |

    NFPA 99 Risk Categories for Oxygen Systems

    NFPA 99 classifies medical gas piping systems by patient risk profile:

    • Category 1 (Critical Care): Facility systems where equipment failure causes major injury or death to patients or caregivers. This applies to operating suites, post-anesthesia care units (PACUs), intensive care units (ICUs), and trauma bays. Oxygen distribution must feature continuous redundancy, primary plus reserve sources, and uninterrupted emergency feeds.
    • Category 2 (General Care): Systems where failure causes minor injury or discomfort. Typical environments include outpatient exam rooms, general hospital wards, and rehabilitation facilities.
    • Category 3 & 4: Minor sedation or zero-risk clinical settings.

    Federal and State Authority Having Jurisdiction (AHJ)

    Facilities operating in Arlington, VA answer to multiple overlapping Authorities Having Jurisdiction (AHJs):

    1. Arlington County Department of Community Planning, Housing and Development (CPHD): Issues mechanical, plumbing, and building permits.
    2. Arlington County Fire Department (ACFD): Reviews exterior bulk cryogenic storage, set-back distances, Emergency Oxygen Supply Connections (EOSC), and fire apparatus access roads under NFPA 55.
    3. Virginia Department of Health (VDH) Office of Licensure and Certification: Regulates hospital licensure and architectural plans.
    4. The Joint Commission (TJC) or DNV: Audits operational health systems for continuous code compliance and safety.

    Why this matters for compliance: Failing to involve both the Arlington County Fire Marshal and an ASSE 6030 verifier during early schematic phases frequently leads to costly delays. If exterior liquid oxygen tank pad setbacks conflict with local zoning or property line easements, the physical tank farm may require complete redesign before receiving a Certificate of Occupancy.


    Primary Supply Engineering: Bulk Cryogenic vs. Manifold Systems

    Sizing and sourcing medical oxygen depends directly on peak patient demand, projected bed census, surgical suite count, and geographic delivery cadences across the Washington D.C. metropolitan corridor. | Diagram text | |, | | Determine Facility Design Flow | | (Bed count, ICU/OR loads, diversity) | | Peak Demand Calculation | | Peak > 35 SCFM Peak < 35 SCFM | | Bulk Cryogenic High-Pressure / | | Liquid System Liquid Manifold | | (VIE Tank Pad) (Cylinder Storage) | | Validate Siting Requirements | | Distance to property lines, roads, | | air intakes, structures (NFPA 55) | | Install Exterior Emergency Oxygen | | Supply Connection (EOSC) |

    1. Bulk Cryogenic Liquid Oxygen (VIE Systems)

    For regional facilities such as large community hospitals, trauma centers, and acute-care medical towers, Vacuum Insulated Evaporator (VIE) systems are the standard solution:

    • Base Components: A vacuum-insulated cryogenic pressure vessel containing liquid oxygen at temperatures below -297°F (-183°C), paired with ambient air atmospheric vaporizers and a pressure control skid.
    • NFPA 55 Separation Distances: Cryogenic bulk tanks demand substantial clearance from property lines (up to 50 ft depending on capacity), building openings (75 ft from emergency exits), public sidewalks, combustible structures, and parked vehicles. In urban or high-density zones like Arlington, calculating these offsets determines whether bulk storage is viable on-site or requires blast-rated firewall barriers.
    • Reserve Requirements: Per NFPA 99 Section 5.1.3.5.11, bulk liquid systems must include an emergency reserve system. This is typically configured as a secondary cryogenic liquid storage tank or an on-site, high-pressure cylinder reserve bank with enough capacity to supply the facility's average peak demand for at least 24 hours.

    2. High-Pressure Cylinder and Liquid Container Manifolds

    For outpatient surgical centers, freestanding emergency rooms, and specialized clinics, a central manifold system offers a compact, cost-effective profile:

    • Automatic Changeover Manifolds: Engineered to alternate between primary and secondary cylinder headers seamlessly without downstream pressure fluctuation.
    • Design Specifications: Headers accommodate high-pressure steel or aluminum cylinders (standard 2200–2400 psig) or liquid liquid-nitrogen/liquid-oxygen dewars (up to 350 psig).
    • Ventilation Protocols: Manifold storage rooms must feature dedicated mechanical exhaust ventilation moving a minimum of 1 CFM per square foot to exterior ambient air, along with appropriate static-dissipative physical grounding.
    System ParameterBulk Cryogenic Liquid TankHigh-Pressure Manifold SystemHybrid Micro-Bulk Storage
    Typical Clinical ApplicationLarge Acute-Care Hospitals (>100 beds)Ambulatory Surgical, Endoscopy (<20 beds)Small Community Hospitals (20–60 beds)
    Operating Supply Pressure50–55 psig (regulated)50–55 psig (regulated)50–55 psig (regulated)
    Space Footprint NeededLarge exterior pad (20' x 40'+)Dedicated interior gas room (8' x 10')Compact exterior pad (10' x 15')
    Refill LogisticsCryogenic tanker truck transferCylinder exchange or micro-bulk fillDedicated route delivery truck
    Arlington Permitting FocusACFD HazMat, NFPA 55 clearanceFire room fire-ratings, ventilationSetbacks, accessibility, concrete specs
    Reserve Requirement24-hr permanent on-site supplyMinimum 1 full reserve bank24-hr secondary manifold or dewar

    Critical Connection: Emergency Oxygen Supply Connection (EOSC)

    Category 1 facilities operating on bulk systems are code-mandated to feature an Emergency Oxygen Supply Connection (EOSC) mounted on the exterior wall of the building (NFPA 99 Section 5.1.3.5.15). | Diagram text | |, | | Portable Supply Hose | | Exterior EOSC Box | | - Check Valves & Isolation | | - Pressure Relief Valve | | - Low-Pressure Master Alarm | | Tie-in Downstream of Main | | Shutoff Valve | The EOSC serves as an emergency bypass if the primary bulk tank and local reserve fail or suffer mechanical damage. Key installation requirements:

    1. Location: Placed outside the building in a secure, weather-protected enclosure accessible by mobile emergency cryogenic tankers. The pad must offer sufficient turning clearance for municipal utility vehicles.
    2. Valving and Relief: Connected downstream of the primary system's main shutoff valve. The assembly must incorporate check valves, isolation valves, emergency shutoff capabilities, and an overpressure relief valve vented away from pedestrian paths.
    3. Signal Monitoring: The EOSC box must incorporate monitored physical switches connected directly to master alarm systems to notify clinical staff when the facility shifts to emergency mobile supply.

    The Distribution Network: Zone Valve Boxes, Alarms, and Station Outlets

    Once medical oxygen departs source equipment and enters distribution risers, pipeline architecture centers on pressure control, departmental compartmentalization, and automated digital monitoring. | Diagram text | |, | | Lateral Branch Distribution | | Zone Valve Area Alarm | | Box (ZVB) Panel (AAP) | | Outside OR Monitors Pres. | | or Floor Zone Drops/Spikes | | Terminal Station Outlets | | - DISS (Critical Care) | | - Quick-Connect (General) |

    Zone Valve Boxes (ZVB)

    Zone valve boxes provide local emergency shutoffs for individual wings, floors, and operating suites:

    • Placement: Positioned outside surgical rooms, directly adjacent to nurse stations, or along main public egress corridors. They must never be concealed behind secured doors, closets, or movable furniture.
    • Labeling: Gauges must clearly identify the gas type, line operating pressure, and specific zones controlled (e.g., "OXYGEN SHUTOFF – OR SUITES 1 THROUGH 4 ONLY").
    • Valves: Must feature full-port quarter-turn bronze/brass ball valves with blow-out proof stems, cleaned for oxygen service, and fitted with locking extensions.

    Master and Area Alarm Architecture

    Medical oxygen systems require dual-stage telemetry to guarantee supply continuity:

    • Master Alarm Panels: Installed in two separate, continuously monitored locations (such as the main hospital security dispatch desk and the central facilities plant office). The master alarm monitors critical source fault signals: bulk liquid levels, low-pressure switches, manifold reserve transitions, and EOSC status.
    • Area Alarm Panels (AAP): Positioned at nurses' stations or clinical command hubs within the zones they protect. A local alarm activates if line pressure shifts ±20% away from the standard 50–55 psig operational range (e.g., dropping below 40 psig or rising above 60 psig). | Diagram text | |, | | DUAL-STAGE ALARM INFRASTRUCTURE | | [Master Alarm System] | | - Location A: Central Plant Control Office | | - Location B: 24/7 Security Center or Dispatch Desk | | - Monitors: Bulk Tank Levels, Reserve Depletion, System Run | | [Area Alarm System] | | - Locations: Directly at Clinical Floor Nurse Stations | | - Monitors: Local Line Pressure Drift (+/- 20% Variance) | | - Alert Threshold: Sounds if Pressure <40 psig or >60 psig |

    Station Outlets and Terminal Fixtures

    Medical oxygen arrives at patient bedsides via specialized gas terminal outlets. These outlets utilize engineered physical configurations to prevent cross-connection hazards:

    • Diameter Index Safety System (DISS): Threaded, keyed connections specified across critical environments including ICUs, hybrid surgical suites, and trauma bays to prevent accidental disconnection.
    • Quick-Connect Terminals (Chemetron, Ohmeda, Puritan-Bennett): Frequently selected for general patient care beds and step-down units.
    • Specialized Integrations: In environments utilizing advanced anesthetic procedures, oxygen supply networks must interface smoothly with clinical waste pathways. For facilities updating anesthesia pathways, installing or upgrading active waste anesthetic gas disposal (WAGD) alongside delivery drops maintains comprehensive regulatory compliance.

    Technical Piping Standards: Copper, Cleaning, and ASSE 6010 Brazing

    The physical integrity of an oxygen distribution pipeline depends on the materials selected, specialized cleaning workflows, and strictly governed joining techniques. Medical gas installations cannot use typical commercial plumbing methods. | Diagram text | |, | | ASTM B819 Seamless Copper (Type K or L) | | Factory Cleaned, Capped & Degreased | | Prep: Cut with Tubing Cutter | | De-burr, Clean with Scotch-Brite (No Oil) | | Active Nitrogen Purging (NFPA 99) | | - Minimum 99.9% Clean Dry Nitrogen | | - Eliminates Internal Cupric Oxide Scaling | | ASSE 6010 Certified Manual Brazing | | - BCuP-Series Filler Metal (No Flux) | | - Continuous Shielding Gas Maintained | | Visual & Mechanical Joint Inspection |

    ASTM B819 Seamless Medical Gas Tubing

    Medical oxygen piping requires seamless copper architectural tube certified under ASTM B819 Standard Specification for Seamless Copper Water Tube for Medical Gas Systems:

    • Wall Thickness: Type K (heavy-duty, approved for underground lines, main external runs, and exposed structural sections) or Type L (interior branch distribution lines).
    • Surface Cleanliness: Tubing must be factory washed, degreased with non-residue solvents, and delivered capped or plugged at both ends to seal out atmospheric particulates.

    The Brazing Standard: ASSE 6010 Installation Protocols

    Under NFPA 99 Section 5.1.10, every individual joining medical gas copper piping must hold an active ASSE 6010 Medical Gas Systems Installer credential. Key brazing mandates include:

    1. Continuous Inert Purging: During brazing, the interior of the pipeline must be continuously swept with oil-free, dry Nitrogen NF. This purge prevents internal oxidation (cupric oxide scale formation). Loose copper flakes downstream will clog delicate ventilator valves, flowmeters, and terminal checks.
    2. Filler Metals: Brazing operations must utilize silver-copper-phosphorus alloys meeting AWS A5.8 class BCuP-series specifications (typically BCuP-5 with 15% silver).
    3. No-Flux Brazing: Flux contains chemical compounds that introduce volatile contaminants or accelerate copper tube corrosion. Under NFPA 99, flux is strictly prohibited on copper-to-copper joints. Flux is permitted only on dissimilar metal joints (e.g., copper tube joined to bronze valve flanges), using specialized water-soluble formulations immediately cleared from the pipe exterior.

    Medical Testing Solutions: Complete Equipment and Service Lifecycle

    At Medical Testing Solutions (MTS), we engineer and supply complete medical gas systems from source equipment to patient delivery. Headquartered in Fort Lauderdale, Florida (501 E Las Olas Blvd, Ste 300), MTS supports commercial mechanical teams, health systems, and clinical contractors across the country and throughout Arlington, VA. | Diagram text | |, | | +, + | | ASSE 6010 Turnkey Pipeline Installations | | +, +, + | | +, v, + | | Equipment Sourcing: Outlets, Alarms, Manifolds | | +, +, + | | +, v, + | | Independent ASSE 6030 System Verifications | | +, +, + | | +, v, + | | Preventive Maintenance & Annual Certifications | | +, + | MTS delivers end-to-end support across clinical project lifecycles:

    • Direct Equipment Sourcing: Explore our comprehensive portfolio of medical equipment and pipeline infrastructure on our products catalog, featuring code-compliant zone boxes, DISS terminal outlets, manifold assemblies, and digital area alarm panels.
    • ASSE 6010 Pipeline Construction: Field technicians execute turnarounds, branch tie-ins, and complex medical floor fit-outs to rigorous industry standards.
    • ASSE 6030 Third-Party Verification: We provide independent documentation certifying your installations meet all local and national life-safety codes.
    • Post-Commissioning Maintenance: Ensure long-term reliability through structured medical gas maintenance services and mandatory annual medical gas inspections to maintain clear regulatory compliance.

    Whether planning a ground-up hospital wing or converting an existing facility, contact Medical Testing Solutions directly at (754) 315-1078 to discuss system design, equipment procurement, and verification schedules.


    ASSE 6030 Third-Party Verification Protocols

    NFPA 99 mandates that the entity verifying a medical gas pipeline must be completely independent from the installing contractor. Verifiers must hold an active ASSE 6030 Medical Gas Systems Verifier certification. The installing trades cannot inspect, verify, or sign off on their own work. | Diagram text | |, | | Initial Standing Pressure Test | | - 150 psig or 1.5x working pressure | | - 24-hour test with zero leak allowed | | Cross-Connection & Identification | | - Individual gas line pressure cycling | | - Validates correct gas to every drop | | Piping Purge & Particulate Testing | | - High-velocity nitrogen sweep | | - 1000L flow across 0.45 micron filter | | Simultaneous Flow & Pressure Drop | | - Verifies system design capacity | | - Terminal drop stays within spec | | Final Purity & Gas Concentration | | - Oxygen concentration > 99.0% | | - Total hydrocarbons < 5 ppm | | - Moisture dewpoint < -20°F (-29°C) | | ASSE 6030 Verification Certification | | Submitted to Arlington County & VDH | Verification requires completing a detailed sequence of commissioning tests:

    1. Initial Standing Pressure Test

    The installing piping system must withstand a 24-hour standing test using oil-free dry nitrogen at 20% above normal system working pressure (or a minimum of 150 psig for typical 50 psig pipelines). Zero leaks are permitted. Verification monitors the installation with calibrated gauges, adjusting mathematically for ambient temperature fluctuations over the 24-hour window.

    2. Cross-Connection and Piping Identification Verification

    The verifier isolates all medical gas systems, cycling pressure through one network at a time while checking all outlets across the facility. This confirms that the oxygen line connects exclusively to physical oxygen terminal drops, eliminating crossover risks with medical air, nitrous oxide, or vacuum lines.

    3. Piping Purge and Particulate Filter Checks

    The ASSE 6030 verifier flushes individual outlets with high-velocity flows to dislodge any traces of debris or dust. A test filter device (0.45-micron white membrane) handles 1,000 liters of purge gas at high velocity; the membrane must show zero discoloration or visible particulate contamination under bright light.

    4. Simultaneous Flow and Delivery Tests

    To confirm that main risers and branch lines maintain proper volume during peak demand, verifiers conduct simultaneous multi-outlet flow tests. The oxygen system must deliver at least 3.0 SCFM (standard cubic feet per minute) at each outlet, with system pressure remaining stable above 45 psig during shared branch loading.

    5. Final Purity and Medical Oxygen Concentration

    Once the piping is purged and charged with operational medical oxygen, the verifier tests every single terminal point for:

    • Medical Oxygen concentration ($\ge 99.0%$ for bulk cryogenic USP supplies, or compliant with USP monographs for oxygen 93% where concentrator skids operate).
    • Hydrocarbons / Volatile Organic Compounds (VOCs) less than 5 ppm.
    • Halogenated solvents ($0 \text{ ppm}$).
    • Carbon monoxide ($< 10 \text{ ppm}$) and carbon dioxide ($< 500 \text{ ppm}$).
    • Moisture dewpoint (less than $-20^\circ\text{F}$ at 50 psig).

    Following successful testing, the ASSE 6030 verifier issues formal documentation for the building owner to present to the Arlington County Building Inspection Division and the Virginia Department of Health. Facilities can also secure ongoing operational safety certifications through third-party medical gas certification providers.


    Step-by-Step Installation & Commissioning Roadmap

    Executing an oxygen system installation within Arlington, VA demands tight logistical orchestration between facility engineers, civil trades, mechanical contractors, and inspectors. | Diagram text | |, | | Phase 1: Engineering & AHJ Approval | | - Architectural review & calculations | | - ACFD & Arlington CPHD permits | | Phase 2: Siting & Bulk Concrete Pad | | - Soil compaction & structural pad | | - Tank crane set & fencing installed | | Phase 3: Interior Mechanical Brazing | | - ASTM B819 piping installation | | - Continuous inert N2 purge brazing | | - Zone valves, alarms, outlets roughed | | Phase 4: Installer Pressure Testing | | - 150 psig standing 24-hour test | | - Contractor preliminary sign-off | | Phase 5: ASSE 6030 Verification | | - Cross-connection verification | | - Purge, flow & concentration checks | | Phase 6: AHJ Closeout & Turnover | | - Fire Marshal physical walk-through | | - VDH sign-off & Certificate of Occup. |

    1. Schematic Siting & Permitting: Finalize oxygen consumption models, pipe routing, and bulk tank locations. Submit structural, mechanical, and fire protection packages to the Arlington County CPHD and Fire Prevention Division.
    2. Bulk Concrete Pad Pour & Civil Work: Construct the reinforced concrete foundation for cryogenic storage per NFPA 55, accommodating pad elevation, bollards, protective security fencing, and grounding rod arrays.
    3. Interior Rough-In and Active Purge Brazing: ASSE 6010-credentialed mechanical trades cut, de-burr, hang, and braze the ASTM B819 Type L/K copper pipeline network under continuous inert dry-nitrogen purge. Install rough-in back boxes for zone valves, area alarms, and patient outlets.
    4. Installer Preliminary Pressure Tests: The primary contractor runs initial pressure tests, valve checks, and internal cleaning purges before dry-walling partitions or sealing architectural ceiling assemblies.
    5. Third-Party ASSE 6030 Final Verification: An independent verifier audits the installation: cross-connection validation, pressure decay analysis, simultaneous line flows, alarm panel logic simulations, and gas purity lab testing.
    6. Regulatory Sign-Off and Clinical Handover: File the signed ASSE 6030 verification package with the Arlington AHJ, complete local Fire Marshal life-safety walkthroughs, and commission the line for clinical service.

    Arlington VA Permitting and Inspection Considerations

    Navigating Northern Virginia building codes requires understanding local infrastructure logistics:

    • Urban Density Challenges: Siting bulk cryogenic tanks along dense transit corridors like the Rosslyn-Ballston corridor requires creative engineering. Where required NFPA 55 property setbacks are physically impossible, facilities must install UL-listed 2-hour or 4-hour fire barrier walls to reduce exterior clearance envelopes.
    • Traffic Logistics and Delivery Routing: Cryogenic transport tankers require direct, unrestricted access to the tank pad. Arlington municipal zoning restricts heavy vehicle idling and turning movements; plans submitted to the Arlington County CPHD must document truck turning radius profiles and delivery access routes.
    • Specialized Clinical Alignments: Hospitals incorporating operating rooms, ambulatory day-surgery wings, or complex dental suites must balance broader utility requirements. Projects involving dental sedation should review specialized dental flowmeter repair and calibration standards alongside main oxygen header work. Similarly, facilities modernizing operating suites must complete isolated power systems and line isolation monitor (LIM) testing before final clinical sign-off.

    Ensure Flawless Oxygen Infrastructure for Your Facility

    Medical oxygen installations require precision engineering, rigorous code compliance, and experienced technical oversight. From sizing cryogenic tank pads and configuring zone valve networks to executing ASSE 6010 brazing and independent ASSE 6030 verifications, Medical Testing Solutions delivers trusted medical gas support across Arlington and the Mid-Atlantic.

    Plan your upcoming hospital installation, clinic expansion, or line replacement with confidence. Request a detailed quote or contact our engineering team today at (754) 315-1078 to speak directly with an ASSE-certified medical gas specialist.


    Frequently Asked Questions

    All trades brazing or installing medical oxygen infrastructure must hold active certification under ASSE Standard 6010 (Medical Gas Systems Installer). The Virginia Uniform Statewide Building Code requires medical gas work to comply strictly with NFPA 99 Chapter 5, which bars standard commercial plumbers from joining medical pipelines without this certification.

    No. Under NFPA 99 Section 5.1.12.1.1.4, the medical gas verifier must be an independent third party who is not employed by, or subordinate to, the installing contractor. The verifier must hold ASSE 6030 (Medical Gas Systems Verifier) credentials to prevent conflicts of interest and ensure life-safety systems receive objective inspection.

    In accordance with NFPA 99, hospital medical oxygen distribution networks are designed to deliver a steady operational line pressure between 50 and 55 psig to terminal outlets. Master and local area alarm panels must activate if system pressure swings by 20%—sounding a warning if line pressure drops below 40 psig or spikes above 60 psig.

    An Emergency Oxygen Supply Connection (EOSC) is mandatory under NFPA 99 for any Category 1 healthcare facility that relies on a bulk cryogenic liquid oxygen supply. The connection must sit outside the facility at a location easily reached by an emergency liquid transport tanker, allowing immediate bypass if the primary bulk tank or internal reserve fails.

    Following initial ASSE 6030 verification and clinical commissioning, NFPA 99 (Section 5.1.14) requires healthcare facilities to implement ongoing operational maintenance and periodic inspection. Most accredited healthcare systems require annual testing of all master and area alarms, operational checks of zone valve boxes, and routine gas outlet testing.

    This article is provided for educational purposes and reflects industry standards as of publication. Always verify against current NFPA 99, CGA, and AHJ requirements. Medical Testing Solutions is ASSE-certified and ready to help — contact us for facility-specific guidance.

    Request a quote for your facility

    Talk with Medical Testing Solutions about your next inspection, repair or equipment request.

    Get a quote in 1 business day

    I agree to receive text messages from Medical Testing Solutions, L.L.C. at the phone number provided, including informational and marketing messages. Consent is not a condition of purchase. Message frequency varies. Message & data rates may apply. Reply STOP to opt out or HELP for help. See our Privacy Policy and Messaging Terms.