Planning a medical gas system installation requires careful coordination between facility managers, contractors, and verification companies. Use this checklist to ensure your project meets NFPA 99 requirements and avoids costly delays.
Medical Gas Service
A Checklist of Questions to Ask When Implementing Medical Gas System Installations
Medical Testing SolutionsJuly 14, 20223 min read
Before Construction Begins
Contractor Qualifications
- Are the installers ASSE 6010 certified medical gas installers?
- Are the brazers ASME Section IX qualified?
- Does the contractor carry adequate insurance and bonding?
- Has the contractor provided references from similar projects?
Design and Planning
- Have blueprints been reviewed and approved by a qualified engineer?
- Does the piping design meet NFPA 99 pipe sizing requirements?
- Are all materials specified as ASTM B819 copper tubing cleaned for oxygen service?
- Has a risk assessment been conducted per NFPA 99 Section 4.2?
- Have all department heads been notified of the project scope and timeline?
Gas Supply Planning
- Is there adequate backup gas supply (minimum 2x estimated demand) during construction?
- Who is responsible for the medical gas back feed during system shutdowns?
- Has the temporary supply been verified per NFPA 99?
- Will master alarm panels remain functional during construction?
During Installation
Quality Control Checkpoints
- Is nitrogen purge being used during all brazing operations?
- Are joints being brazed with BCuP-5 or equivalent silver-based alloys?
- Are pipe labels being installed per CGA C-9 and NFPA 99 guidelines?
- Are zone valve boxes being installed at required locations with proper labeling?
- Are alarm panels being installed and wired to specification?
Testing by the Installer (ASSE 6010)
- Initial pressure test, standing pressure test at 1.5x operating pressure for 24 hours
- Cross-connection test, verify no cross-connections between different gas systems
- Purge and blow-down, remove construction debris and particulates
After Installation
Independent Verification (ASSE 6030)
- Has an independent ASSE 6030 verifier been engaged (not employed by the contractor)?
- Have all verification tests been scheduled after installer testing is complete?
- Per NFPA 99 Section 5.1.14.5.6, verification cannot begin until all installer tests are complete
Documentation
- Are as-built drawings available and accurate?
- Has the contractor provided all brazer qualification records?
- Are test reports complete and ready for regulatory review?
- Has the system been added to the facility's annual inspection schedule?
Common Mistakes to Avoid
- Using non-certified installers or brazers
- Skipping nitrogen purge during brazing (causes oxidation and contamination)
- Hiring a verifier who works for the contractor (conflict of interest)
- Inadequate backup gas supply during system shutdowns
- Missing or incorrect pipe labeling
- Failing to schedule annual inspections after project completion
Need Help Planning Your Installation?
Medical Testing Solutions provides medical gas installation and verification services nationwide with ASSE 6010 and 6030 certified technicians.
Call (754) 315-1078 or request a free quote.
Related Resources
Request a quote for your facility
Talk with Medical Testing Solutions about your next inspection, repair or equipment request.