    Planning a medical gas system installation requires careful coordination between facility managers, contractors, and verification companies. Use this checklist to ensure your project meets NFPA 99 requirements and avoids costly delays.

    Before Construction Begins

    Contractor Qualifications

    • Are the installers ASSE 6010 certified medical gas installers?
    • Are the brazers ASME Section IX qualified?
    • Does the contractor carry adequate insurance and bonding?
    • Has the contractor provided references from similar projects?

    Design and Planning

    • Have blueprints been reviewed and approved by a qualified engineer?
    • Does the piping design meet NFPA 99 pipe sizing requirements?
    • Are all materials specified as ASTM B819 copper tubing cleaned for oxygen service?
    • Has a risk assessment been conducted per NFPA 99 Section 4.2?
    • Have all department heads been notified of the project scope and timeline?

    Gas Supply Planning

    • Is there adequate backup gas supply (minimum 2x estimated demand) during construction?
    • Who is responsible for the medical gas back feed during system shutdowns?
    • Has the temporary supply been verified per NFPA 99?
    • Will master alarm panels remain functional during construction?

    During Installation

    Quality Control Checkpoints

    • Is nitrogen purge being used during all brazing operations?
    • Are joints being brazed with BCuP-5 or equivalent silver-based alloys?
    • Are pipe labels being installed per CGA C-9 and NFPA 99 guidelines?
    • Are zone valve boxes being installed at required locations with proper labeling?
    • Are alarm panels being installed and wired to specification?

    Testing by the Installer (ASSE 6010)

    • Initial pressure test, standing pressure test at 1.5x operating pressure for 24 hours
    • Cross-connection test, verify no cross-connections between different gas systems
    • Purge and blow-down, remove construction debris and particulates

    After Installation

    Independent Verification (ASSE 6030)

    • Has an independent ASSE 6030 verifier been engaged (not employed by the contractor)?
    • Have all verification tests been scheduled after installer testing is complete?
    • Per NFPA 99 Section 5.1.14.5.6, verification cannot begin until all installer tests are complete

    Documentation

    • Are as-built drawings available and accurate?
    • Has the contractor provided all brazer qualification records?
    • Are test reports complete and ready for regulatory review?
    • Has the system been added to the facility's annual inspection schedule?

    Common Mistakes to Avoid

    • Using non-certified installers or brazers
    • Skipping nitrogen purge during brazing (causes oxidation and contamination)
    • Hiring a verifier who works for the contractor (conflict of interest)
    • Inadequate backup gas supply during system shutdowns
    • Missing or incorrect pipe labeling
    • Failing to schedule annual inspections after project completion

    Need Help Planning Your Installation?

    Medical Testing Solutions provides medical gas installation and verification services nationwide with ASSE 6010 and 6030 certified technicians.

    Call (754) 315-1078 or request a free quote.


    Related Resources

    This article is provided for educational purposes and reflects industry standards as of publication. Always verify against current NFPA 99, CGA, and AHJ requirements. Medical Testing Solutions is ASSE-certified and ready to help — contact us for facility-specific guidance.

    Request a quote for your facility

    Talk with Medical Testing Solutions about your next inspection, repair or equipment request.

    Get a quote in 1 business day

    I agree to receive text messages from Medical Testing Solutions, L.L.C. at the phone number provided, including informational and marketing messages. Consent is not a condition of purchase. Message frequency varies. Message & data rates may apply. Reply STOP to opt out or HELP for help. See our Privacy Policy and Messaging Terms.

    Prefer to talk? Call (754) 315-1078

    Related articles